At Gough Engineering, we're proud to have continued our partnership with Lavazza, a leader in the coffee industry, by delivering cutting-edge bulk handling systems. In 2020, we provided Lavazza's Basingstoke, UK, facility with their first triple FIBC big bag discharging station.
In 2024, Lavazza returned to us for a second system for its production line — this time with a taller configuration demonstrating its confidence in our systems, engineering and service.
Here’s a project overview of Gough Engineering’s supply of triple big bag discharging stations to Lavazzer.
Materials handled:
Application:
How it works:
The project’s scope involved the design, manufacture and full installation of three single big bag (GBB) discharger systems, which included:
From initial design checks in May 2024, through drawing approval, to final delivery in August, Gough Engineering provided a seamless experience from concept to completion.
At Gough Engineering, we specialise in creating tailored bulk handling systems that meet the unique requirements of our clients.
Contact us today to see how we can support your next project with solutions like vibratory feeders, FIBC big bag discharging stations and more. Call our team of experienced engineers on 01782 567770 or fill out our online enquiry form below.